For the UH residential project in Berlin Adlershof, the budget was tight. Yet thanks to BIM and a timber hybrid construction method with a high degree of prefabrication, it was not exceeded.
BIM2FIELD is the logical step from BIM-based design to construction with BIM. Thanks to Bimplus and robust equipment, KIBAG is already successfully using BIM models on the construction site.
Every professional in the architecture, engineering, and construction (AEC) industry is acutely aware of the need to decarbonize buildings and infrastructure. Yet sometimes, it is not always obvious..
You will receive weekly e-mail updates about new blog articles. You may choose not to receive future communications at any time.