Pécs’ New Market Hall – An Allplan Engineering Case Study

June 2, 2021

In Pécs, Hungary’s fifth-largest city, a new market hall began construction in 2020. Besides an indoor market, the new building will also include trade fair spaces, shops, service units, as well as cold stores for the shops when the structure is completed in 2022. Covering over 5,600m² and costing ten million Euros to design and construct, the large building was designed by just six engineers using Allplan Engineering.

1_NEU[1]© CENC Ltd.

Complex Reinforcement Designs

The structure required around 4,300m³ of concrete to create the frame, which included impressive concrete arches within the main sales hall. The arches required a complex arrangement of reinforcement as well as a high degree of accuracy, both of which would have been difficult and time-consuming to design using 2D CAD. With Allplan Engineering, however, the reinforcement model was created efficiently and accurately thanks to the 3D visualization and the in-built clash detection tools. In addition, the connections from the arches to the prefabricated structures were also able to be precisely designed to avoid any errors during construction.

04_NEU[1]© Tamás Gettó and Gergely Sztranyák


Easy Collaboration

The architects were able to significantly reduce the time required for the design thanks to the seamless information sharing and collaboration that Allplan Engineering enabled. Both the architects and the company designing the prefabricated elements used Allplan for their respective tasks and were able to share models quickly and easily for an accelerated and simplified design schedule.

02_NEU[1]© Tamás Gettó and Gergely Sztranyák


Outcomes

ALLPLAN’s civil engineering design software was chosen for its speed, cost-effectiveness, and accuracy, as well as the ability to design reinforcement without the need for separate reinforced concrete software. Not only could the design be carried out efficiently, but the outcome was a significant reduction in design costs for the client while still ensuring a high-quality design.

05_NEU[1]© Tamás Gettó and Gergely Sztranyák


Project Information

Architects: Tamás Gettó, Gergely Sztranyák

Structural designer: CENC Ltd., Marcell Duga, László Nagy

Contractor: B Build Trade Ltd., Balázs Benik

last_picture_NEU© CENC Ltd.


 

Category: